Abstract
Abstract Because nuclear power development entails massive initial investments in power plants, along with institutional innovations in regulation, law, and basic physical infrastructure, there are strong grounds to support the pervasiveness of the central state in the industry. Furthermore, considering the scale economies in reactor installation, standardization in design, and enhanced learning by doing, little scope remains for the consideration of decentralized business interests. This article argues that competition, in the sense of rivalry between firms, can nonetheless be a driving force behind the nuclear industry. To illustrate the point, we draw a comparative, eventful history of two Iberian nations, Portugal and Spain: Portugal has failed several attempts to introduce nuclear power, while Spain has become one of the largest nuclear power nations in Europe. A fine-grained analysis of the circumstances surrounding the nuclear history of both countries is presented, highlighting the key variables of business history and the role of the central state and political actors in economic policy.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.