Abstract

The Elettra Storage Ring is operating for external Users since 1994. High stability, low ripple, DC power supplies are needed for energizing the magnets used to keep the electron beam on the defined path with the required characteristics. The remote control of the power supplies is still based on VME standard and serial MIL 1553 network. A study for upgrading the local power supplies control system, adopting modern technologies and software tools is presented in the article, along with the inherent difficulties due to the large number of units and the impact on the operation of the accelerator.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.