Abstract

Before 2010, it was generally believed that the control method of △I was difficult for M310 improved CPR100, a typical representative of millions of nuclear power units, and it was regarded as one of the difficult problems that reactor operators and even senior operators must strive to overcome. With the increase of the capacity of nuclear power units and the expansion of various new energy units, great changes have taken place in the power structure of the power grid. The operation of nuclear power plants has been required to join the camp of peak shaving from a single long-term maintenance of full power, which brings about changes in the core control strategy, and the control of axial power is the most prominent problem in the core control. The control strategy and key points of axial power deviation of 1000 MW nuclear power unit for reducing load to 75% Pn are analyzed in this paper, the conclusion can provide reference for the operation of nuclear power unit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.