Abstract

The present paper describes new modular bridges solutions developed by MBSbyBERD, with higher range of spans and load capacity, fast assembly and smart packing. As an upgrade of the Bailey bridges type, MBSbyBERD’s developed new structural solutions thought to be launched by increment launching.Natural disasters, conflicts between peoples and the aging of existing infrastructures have been the main causes for the search of modular bridges as a solution for the rapid reestablishment of interrupted roads. MBSbyBERD solutions aims to accelerate the reestablishment of the connections comparing with the existing market solutions. Designed to be pre-assembled and containerized in order to minimize assembly time, 4 different models of modular bridges have been developed, optimized to cover a range of spans from 15m to 120m. The new range of spans up to 120m offered by BERD, open new possibilities of bridging further margins reducing distances between populations and so social and economic impact.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.