Abstract

A new energy ramping control system is developed to increase electron beam energy from 2.0 GeV to 2.5 GeV in the Pohang Light Source storage ring. The control system shows faster energy ramping and more stable beam characteristics than the previous energy ramping control system that consists of an operator interface workstation, subsystem control computer and machine interface units. The previous system controls current settings of the magnet power supplies in multiple steps with different energy increment rate during the energy ramping. In order to improve synchronization of the magnet power supply systems and beam stabilities during the energy ramping, we developed the energy ramping controller hardware that is controlled using a network of optical fibers. Thus, the new ramping system is able to control more synchronously the magnet power supplies with a constant energy increment rate during the energy ramping. With this reliable synchronization, it is also possible to perform the energy de-ramping step from 2.5 GeV to 2.0 GeV on operation. We present the new energy ramping control system and its improved performance on operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.