Abstract

We consider the single-machine time-dependent scheduling problem with linearly deteriorating jobs arriving over time. Each job i is associated with a release time ri and a processing time pi(si)=αi+βisi, where αi,βi>0 are parameters and si is the job's start time. In this setting, the approximability of both single-machine minimum makespan and total completion time problems remains open. We develop new bounds and approximation results for the special case of the problems with uniform deterioration, i.e. βi=β, for each i. The main contribution is a O(1+1/β)-approximation algorithm for the makespan problem and a O(1+1/β2) approximation algorithm for the total completion time problem. Further, we propose greedy constant-factor approximation algorithms for instances with β=O(1/n) and β=Ω(n), where n is the number of jobs. Our analysis is based on an approach for comparing computed and optimal schedules via bounding pseudomatchings.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.