Abstract

In this paper a neural system for daily forecasting of electric power load in Poland is presented. Basing on the simplest neural architecture - a multi-layer perceptron - more and more complex system is built step by step. A committee rule-aided hierarchical system consisting of modular ANNs is obtained as a result. The forecasting mean absolute percentage error (MAPE) of the most effective system is about 1.1%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.