Abstract

This paper presents a new network-constrained unit commitment (UC) model, which is formulated as a mixed-integer linear programming (MILP) optimization problem with embedded ac power flow (AC-PF) constraints. Piecewise linear AC-PF equations are formulated, which constrain the UC dispatch schedule within permissible transmission capacity and voltage deviation limits, solely by executing the main optimization problem. The proposed model is tested on a six-bus and the IEEE RTS-79 test systems, using GAMS software, whereas the obtained AC-PF results are validated against DIgSILENT/Powerfactory package. The UC schedules are comparatively assessed with detailed results presented in the relevant literature for the same test systems, employing different UC+AC-PF models.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.