Abstract
Flexible process planning (FPP) involves selecting and sequencing the requisite operations according to technological requirements, and meanwhile allocating a right machine, a right tool and a right access direction to each selected operation by a given criterion. In this article, the FPP problem is exactly and concisely formulated as linear integer programming models based on the topology of the AND/OR-network under two criteria: production cost minimisation and completion time minimisation. Distinctively, more flexible manufacturing elements and process plan evaluation criteria are considered; more complicated tool and access direction changeover identifications are linearly expressed without the big-M parameter. Compared with the latest mathematical programming models for process planning, the proposed models have lower complexity and better performance. The results from numerous comparative experiments indicate that (i) the number of decision variables of the proposed models reduces approximately by 68% and the number of constraints of the proposed models dramatically reduces by 99%; (ii) within the same running time, the proposed models can exactly solve more benchmark cases than the latest models; and (iii) the solutions obtained by the proposed models are also better than the best ones founded by some state-of-the-art meta-heuristic algorithms.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.