Abstract
This field is located in the estuary. The tidal flat is formed at low tide, and many water birds come flying here. In addition, short-neck clams and corbiculas lives in the riverbed. Therefore, it was necessary to attempt the decrease of the environmental impact by shortening of construction period or construction range reduction in this river. When we constructed earthquake resistant reinforcement of new Yahata river bridge, we used dry repair industrial method by temporary steel caissons these problems. As a result, we contributed to shorten the construction period.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.