Abstract

Abstract We study a problem of optimal scheduling and lot-sizing a number of products on m unrelated parallel machines to satisfy given demands, minimizing the makespan criterion. A sequence dependent setup time is required between lots of different products. The products are assumed to be all continuously divisible or all discrete. The problem is motivated by the real-life scheduling applications in multi-product plants. We derive properties of optimal solutions, NP -hardness proof, enumeration and dynamic programming algorithms for various special cases of the problem. A greedy-type heuristic is proposed and tested in computational experiment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.