Abstract

According to the risks and risk control target in energy performance contracting (EPC), this paper has designed the risk control measure set. On the basis, a risk control model is put forward, including the risk evaluation, risk control cost, risk loss. Then, a multi-objective ant colony algorithm, based on Pareto theory, is used to solve the model. A series of Pareto optimal solutions are got by example. The result shows that the solutions have the better diversity and convergence. At the same time, the model can find the best combination of various risk control measures in EPC, which can provide direct evidence for the company of EPC.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.