Abstract

A multi-period power optimization model for the UAE's electricity sector is presented. The model aims to minimize the cumulative costs and CO2 emission of the UAE's power sector during the planning horizon. The optimization problem was formulated as a multi-period MILP model in the GAMS modelling system. Previous studies have analyzed the UAE power infrastructure using standard simulation software such as MARKAL and MESSAGE. The present work's novelty consists of determining the optimal evolution of the power generation infrastructure during different time periods under operational and environmental constraints. The optimization model was used to study the UAE's power system for the time periods comprised between the years 2015 and 2040. The simulation results show that the mathematical model is a valuable tool for planning the optimal evolution of the power plants’ fleet in the country, reduce levelized electricity costs and emissions, meet energy targets, and evaluate new power technologies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.