Abstract

Engineering management is an extremely important aspect of construction engineering, and a better management approach can greatly enhance the production profits of enterprises. Traditional management optimization schemes cannot adapt to current technological needs due to their inability to effectively consider the impact of each factor. Therefore, a construction management optimization scheme combining improved particle algorithm and multi-objective optimization was proposed. The improved particle algorithm enhances its performance by introducing adaptive weight and multi-objective optimization ideas. These studies confirmed that the predicted direct cost savings for the project were around 1 million yuan. The total construction period of project was optimized to 380 days, saving 34 days. The optimization technology not only reduced construction costs, but also reflected the problems that could be improved during this construction process. This study contributes to achieving multi-objective balance in the construction management process, effectively improving project efficiency, reducing project costs and risks, and providing scientific support for construction decision-making.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.