Abstract
The objective optimization was to minimize total earliness/tardiness and number of setups at machine.A jointed algorithm to solve problems based on Control Weight Evolutionary Algorithm(CWEA) and optimization algorithm was presented.Firstly,the CWEA was used to determine scheduling sequence preference.Secondly,a kind of optimization algorithm was put forward to adjust the starting time for determined scheduler.The simulation results show that the effectiveness of the proposed algorithm in solving the problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.