Abstract

Reduced funds and the need for a consistent method of choosing between many proposed schemes each with different non-quantifiable benefits has made a reappraisal of methods of evaluating minor roading projects desirable. The paper has two major sections. First, the results of a study to determine the extent to which economic evaluation of any sort is used for evaluating minor works projects and to determine what other evaluation methods are currently used (56 cases were studied). Second, a revised method of evaluation, developed to take into account significant factors highlighted in the study, is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.