Abstract
This paper considers a two-machine multi-family scheduling problem with reentrant production flows. The problem consists of two machines, M 1 and M 2, and each job has the processing route (M 1, M 2, M 1, M 2). There are identical jobs in the same family and the jobs in the same family are processed in succession. Each machine needs a setup time before the first job in a family is processed. The objective is to minimize the maximum completion time. Examples of such a problem occur in the bridge construction, semiconductor industry and job processing on numerical controlled machines, where they usually require that the jobs are reprocessed once and there are identical jobs in the same family. This problem is shown to be NP-hard. A branch-and-bound algorithm is proposed, and computational experiments are provided.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.