Abstract
The global decline in environmental quality includes direct and indirect impacts from industries that meet individual needs or complementary facilities. Industrial development is one of the support systems that plays a role in meeting these needs. One of the industries located in the bonded area in the Cikarang area produces sheet plastic goods industry in the form of Polycarbonate roofing. Related to this, PT XYZ (the initiator) in the implementation of its daily operations makes efforts to manage and monitor the quality of the environment so that it can be controlled and managed if it exceeds the permitted capacity or quality standards as regulated in the applicable laws and regulations in accordance with the affected environmental components or humans, in this case workers who are directly related to the production process. The purpose of this study is to provide information on the company's operational conditions during a certain period so that environmental quality can be continuously monitored and corrected if any exceed the predetermined quality standards. The research was conducted at PT XYZ which is located in the Industrial Estate, Cicau Village, Central Cikarang District, Bekasi Regency, West Java. The object of research is industrial environmental quality monitoring. The research method is experimental, including environmental quality sampling at several monitoring points that can represent the impacts resulting from industrial activities, laboratory analysis, then the results of the analysis are compared with applicable regulations to be used as a basis for decision making for no further or correction of environmental quality that has the potential to decline and needs improvement. The noise level at PT XYZ for monitoring semester 2, year 2022 where the noise level at 1 (one) monitoring point exceeds the quality standard but is still within the noise level tolerance of ± 3 dBA, namely the Crusher Area, 85.9 dBA respectively. The measured work environment climate in semester 2, year 2022 has increased for the Fisnish Good area and Crusher Area and has not increased significantly so that control efforts are needed, currently the installation of environmentally friendly solar cell panels has been carried out and is awaiting permission to be operationalized
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.