Abstract

A modified method has been evolved to form the loss coefficients of an electrical power system network by decoupling load and generation and thereby creating additional ficticious load buses. The system losses are then calculated and co-ordinated to arrive at an optimum scheduling of generation using the standard co-ordination (λ iteration) equation. The method presented is superior to the ones currently available, in that it is applicable to a multimachine system with random variation of load and it accounts for limits in plant generations and line losses. The precise nature of results and the economy in the cost of energy production obtained by this method is quantified and presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.