Abstract

The blasting vibration in Qingdao Cross-harbor Tunnel Guide Line Project is monitored and analyzed. We discover that the surface particle vibration velocity in the range of 5metres around the working face reduces fast, and that does not conform to Sadaovsk formula. This inquiry adopts the hypothesis-fitting-testing method to modify Sadaovsk formula. The empirical formula of the ground vibration velocity caused by blasting in tunnel is obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.