Abstract
Utilization of off‐highway vehicles forms an essential part of UK industry's efforts to augment the productivity of plant operations and reduce production costs. However, uninterrupted utilization of plant and equipment is requisite to reaping the maximum benefit of mechanization; one particular problem being plant breakdown duration and its impact upon process productivity. Predicting the duration of plant downtime would enable plant managers to develop suitable contingency plans to reduce the impact of downtime. This paper presents a stochastic mathematical modelling methodology (more specifically, probability density function of random numbers) which predicts the probable magnitude of ‘the next’ breakdown, in terms of duration for tracked hydraulic excavators. A random sample of 33 machines was obtained from opencast mining contractors, containing 1070 observations of machine breakdown duration. Utilization of the random numbers technique will engender improved maintenance practice by providing a practical methodology for planning, scheduling and controlling future plant resource requirements. The paper concludes with direction for future research which aims to: extend the model's application to cover other industrial settings and plant items; to predict the time at which breakdown will occur (vis‐à‐vis the duration of breakdown); and apply the random numbers modelling to individual machine compartments.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Engineering Construction and Architectural Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.