Abstract
Various dynamic factors impact the movement of materials within a manufacturing environment, increasingly becoming complex for multi-product assembling plants owing to the multiplicity and interconnectedness of these factors. Analyzing these factors can be equally complex, requiring modelling and simulation tools. This paper looks at the modelling and simulation of the materials flow of a multi-product furniture assembling plant to develop an efficient system that accomplishes timely product deliveries at minimal cost. Generic simulation models based on 2 products were developed and constructed using Arena® Simulation Software. Following the simulation experiments and implementation of the results, the average hourly throughput was significantly increased and additional space to store materials prior to processing at workstations was created. The generic models were compatible with the company's other products and hence useful for the company's production planning and scheduling.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.