Abstract

Production scheduling of an FMS is formulated as a multi-level integer program. The hierarchical decision structure is proposed which includes the following problems: (i) part type selection — determining a subset of part types for simultaneous processing; (ii) machine loading — the allocation of operations and required tools among the machines; (iii) part input sequencing — determining the sequence and timing of release of parts to the system; (iv) operation scheduling — determining the detailed schedule for processing the parts in the system. The integer programming formulations for all these problems are presented as well as the solution algorithms for part sequencing and operation scheduling. A simple numerical example illustrates the approach proposed, and some computational results are reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.