Abstract

The objective of this paper is to present an approach in developing a virtual active heave compensation system for a draw-works on a hoisting rig. A virtual system enables quicker overall product development time of a physical system as well as flexibility in optimizing the design parameters. Development of the virtual system started with the modelling of the draw-works and hoisting rig dynamics. Simulations of this model were run in two operational modes while subject to a sinusoidal wave: heave compensation and seabed landing of a payload. The results were analyzed and used for optimization in terms of cost and performance. This lays the groundwork for further testing either through hardware-in-the-loop testing (HIL) or using an actual prototype.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.