Abstract
A new scheduling model for the bulk ore blending process in iron-making industry is presented, by converting the process into an assembly flow shop scheduling problem with sequence-depended setup time and limited intermediate buffer, and it facilitates the scheduling optimization for this process. To find out the optimal solution of the scheduling problem, an improved genetic algorithm hybridized with problem knowledge-based heuristics is also proposed, which provides high-quality initial solutions and fast searching speed. The efficiency of the algorithm is verified by the computational experiments.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.