Abstract

Waste heat from a data centre (DC) is a promising heat source because of the evenly distributed load profile and intensive waste heat generation. Many studies have proven the substantial financial benefits for the district heating (DH) operators by integrating DC waste heat with DH systems. However, there is a scarcity of research focusing on the optimal control of the DH system after integrating DC waste heat to further improve the system’s economic performance. Therefore, this study aimed to further improve the economic performance of a DH system with DC waste heat by utilizing a model predictive control (MPC) scheme. This MPC scheme employed an economic-related objective function and formulated technical operational constraints. The proposed MPC scheme was tested on a campus DH system in Norway by simulation. Compared to a traditional rule-based control approach, the MPC scheme reduced the monthly energy cost by 1.8% while providing more stable chilled water for the DC cooling system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.