Abstract
In this paper,we have been obtainedMLE and Bayes Estimator of utilization factor in Power Supplyqueuing model based on requirement of power forthe number of customers at various sampled time points. We have been checked the consistency of maximum likelihood estimator of utilization factor and find the confidence interval for expected MLE of it.Bayes estimators of utilization factor havealso been obtained.We also derive the expression for Expectation of MLE of ρ, Bayes estimate of ρ under squared error loss function. Fordifferent choices of hyper-parametersthe minimum posterior risk of this Bayes estimator has also been obtained numerically by using R software packages.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Turkish Journal of Computer and Mathematics Education (TURCOMAT)
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.