Abstract

In this paper, we present a modification of Endres's method for minimizing AFI for Continuous Sampling Plan CSP-2 plan under inspection error. The measure of average outgoing quality (AOQ) under both perfect and imperfect replacemant conditions are considered. Both CSP-1 plan and CSP-2 plan under inspection error have the same minimum AFI when the specified process average fraction detective, p , is larger than the average outgoing quality limit, AOQL. Under the same sampling cost, one can use the proposed model to minimize AFI of CSP-I plan under inspection error to replace that of CSP-2 plan under inspection error, because CSP-I plan is more convenient to execut than CSP-2 plan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.