Abstract

Multivariate exponentially weighted moving average (MEWMA) control charts for individual monitoring require a priori knowledge of the in-control parameters. In practice, this assumption is not always tenable, and estimated parameters are generally obtained from an in-control reference sample of m preliminary observations (Phase I sample). Here, we compared the Phase II performance of MEWMA control charts using different methods for estimating the covariance matrix when the in-control covariance structure is unknown, and only a small Phase I sample is available. The performance of the MEWMA control charts varied among the methods. For simulated data with small m, the performance of MEWMA control charts using a shrinkage estimate of the covariance matrix was superior (in terms of run-length properties) to the alternative methods considered in this study. The improved performance of MEWMA control charts using the shrinkage estimate was also demonstrated via illustrative case studies of bimetal thermostat and gene expression applications; changes were detected earlier by the shrinkage-based MEWMA method

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.