Abstract

Houdingxiang No. 3 Bridge is a 4-span steel box girder bridge. After the incremental launching construction, the bridge has to be lowering to the support bear, the lowering construction is divided into three stages. At first the launching equipment is used to lower 80cm, the next the jack with load capacity of 180 tons is used to lower 110cm, finally three-direction-jack with load capacity of 200 tons is used to lower 20cm. mechanical analysis on lowering the bridge used jacks with the load capacity of 180 tons and 200 tons is respectively carried out by FEM software ABAQUS, and the result shows that this kind of lowering technique is safe and reliable, it meets the construction demand.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.