Abstract

Final assembly plants send material schedules to first-tier suppliers who in turn send schedules to second-tier suppliers and so on through the multiple tiers of the supply chain. A key cost driver for the supply chain is a schedule characteristic termed stability. The Total Quality Management approach is applied to improve schedule stability in the supply chain of a large vertically integrated automotive manufacturer. A measurement described, actual stability results are provided, the causes of instability are listed, and some corrective actions are specified. Results indicate that schedule stability can be improved without damaging the performance of other measures such as inventory and customer responsiveness. and analysis process is

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.