Abstract

Production scheduling tools close the gap between ERP/MRP II tools and the plant floor. Simulation can be used to generate production schedules on an ongoing basis in a way that does not violate constraints related to the limited availability. In this paper, the process of tablet manufacturing in a pharmaceutical production plant is studied, first the full process is described and mapped, and then a process simulation is run. Based on the simulation results, statistical analysis is performed; the data is fitted by using regression analysis. Design of experiment (DOE) analysis is performed on the process to try many different combinations of resource levels automatically, and finally analysis of variance (ANOVA) is performed to select infeasible products that can be excluded from future production plans, this will have a positive effect on the return on investment for the organisation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.