Abstract
<p class="Abstract">"PTB Testing Instructions, Volume 25: Gas meters – Test rigs with critical nozzles" (PTB 25) includes a detailed description of a test to evaluate the tightness of the rig (leak test). The mathematical modeling of this test assumes that temperature remains constant, and it is established a maximum allowable change of 0.1 K during the test. PTB 25 defines a maximum value of the leak flow rate as criteria for approval of the test.</p><p class="Abstract">In this work, the effect of the assumption of constant temperature over the leak test result was analyzed. Different processes in which the real leak flow rate was zero and there was a change in the temperature of the system equal to the maximum permissible (according to PTB 25) were simulated, and the leak flow rate calculated by PTB 25’s model was determined. The assumption of constant temperature does not simplifies drastically the mathematical model. It is concluded that PTB 25’s maximum allowable temperature change is too high for most practical situations, leading to errors that exceeds the maximum allowable leakage rate. The factors “test time” and “enclosed volume” have a high effect over the magnitude of the error given by PTB 25’s leak flow rate model.</p>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.