Abstract

Highways have been and are built using Hot Mix Asphalt (HMA) as surface layer. The most common HMA design procedure is the Marshall Method, a method also used for quality control (QC) at the time of road construction. Due to several factors, sometimes it is not possible to sample the surface layer when constructed. When this occurs, QC is performed after construction by analyzing cores. Current regulations, however, fail having clear procedures regarding the collection and analysis of pavement cores after the complete placement of the asphalt mixture. For this reason, this study proposes a comparative analysis of Marshall parameters, mixture densities, and aggregates gradation obtained from specimens obtained during construction, versus cores samples extracted 30 and 60 days later. The research revealed that all the parameters measured on core samples, except flow, could be used to approve asphalt paving works after its construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.