Abstract
Abstract This paper presents a novel and effective methodology for transmission expansion planning (TEP) in a double-auction based electricity market. The TEP problem has been formulated as a nonlinear programming problem to maximize the social welfare function of market participants (Generation and Distribution Companies), subject to power system operational and security constraints. The proposed methodology has been solved in two parts: in the first part, nonlinear TEP problem has been solved for a number of market scenarios to identify a set of prospective transmission lines; and in second part, multi-criteria data envelopment analysis has been applied on the identified set of prospective lines to select the most effective ones for transmission reinforcement. The stopping criterion of the TEP methodology has been applied based on the fact that increment in social welfare obtained by transmission reinforcement should be more than the investment cost of Transmission Company. The proposed methodology is well suited for nonlinear modeling of power systems as it reduces the complexity and computational burden of TEP problem substantially. To illustrate the efficacy of the proposed methodology, simulation result of Garver’s six-bus, IEEE 24-bus reliability test, and IEEE 662-bus systems have been presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.