Abstract

Abstract The objective of this study was to manufacture thermoplastic elastomer tubes by a novel water assisted injection molding technology and to experimentally investigate the effects of various processing parameters on the molded parts quality. Styrene-ethylene/butylene-styrene (SEBS) compounds based thermoplastic elastomers were used for all the experiments. Experiments were carried out on a lab-developed water assisted injection-molding system, which included a water pump, a water injection pin, a water tank equipped with a temperature regulator, a pressure accumulator, and a control circuit. A porous type water injection pin was designed and made to mold the parts. After molding, the lengths of water penetration as well as the hollowed core ratios in molded tubes were measured. The effects of different processing parameters on the hollowed core ratios were determined. It was found that the melt temperature and water injection delay time were the principal factors influencing the water penetration behaviors. In addition, a comparison has been made between the parts molded by water assisted injection molding and gas assisted injection molding. The results suggest that water assisted injection molded parts mold parts with less residual wall thickness distributions along the channel. However, thermoplastic elastomers molded by water exhibited higher wall thickness difference at curve sections than those molded by gas.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.