Abstract

Parts fabrication is the first manufacturing stage where components and zones for hull construction are produced. The production efficiency at this stage can hardly be achieved due to part heaviness and dynamic characteristics in a shipyard. In this paper, given production sequence in the parts fabrication, the problem is to optimally select machines and production division, such that the total flow-time is minimised as well as balancing the workload among machines. Specifically, three mathematical models for flow-time minimisation and workload balance simultaneously considering both objectives, and a numerical example are presented and analysed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.