Abstract

Long-term operation of the biomass-to-liquid (BTL) process was conducted with a focus on the production of bio-syngas that satisfies the purity standards for the Fischer–Tropsch (FT) process. The integrated BTL system consisted of a bubbling fluidized bed (BFB) gasifier (20kWth), gas cleaning unit, syngas compression unit, acid gas removing unit, and an FT reactor. Since the raw syngas from the gasifier contains different types of contaminants, such as particulates, condensable tars, and acid gases, which can cause various mechanical problems or deactivate the FT catalyst, the syngas was purified by passing through cyclones, a gravitational dust collector, a two-stage wet scrubber (packing-type), and a methanol absorption tower. The integrated system was operated for 500h over several runs, and stable operating conditions for each component were achieved. The cleaned syngas contained no sulfur compounds (under 1ppmV) and satisfied the requirements for the FT process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.