Abstract

In quality control we find techniques that come from different fields, because the objective is to reduce the variability in quality characteristics, these are control and adjustment of processes. In this work, the individual control charts (Xind and Rm) were used to monitor the loading time of a truck measured during 60 consecutive days of a cargo transport company in Rio Grande do Sul. The results showed that the process is out of control both in average and variability, requiring a systematic monitoring in order for the company to maintain the quality of services provided to its customers.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.