Abstract

AbstractThis paper proposes a new comprehensive load restoration (LR) method for electrical distribution networks. Since two main technologies of switching equipment are there in the modern distribution networks, namely manual switches (MSs) and remote‐controlled switches (RCSs), this article has benefited from this concept effectively. A two‐stage algorithm that provides the system operators with the ability to recover part of the loads in the shortest possible time by RCSs is proposed. After this step, the remaining loads will be restored by a combination of MSs and RCSs. The other strength of this algorithm is to provide accurate and practical solutions so that the sequence of switching actions is clearly defined. Also, using an innovative index called expected weighted energy not supplied as the objective function of the main problem will ensure the operators recover the maximum amount of load in the shortest time possible. This novel method was applied on a sample standard IEEE distribution test network. The simulation results proved the effectiveness of this proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.