Abstract

We propose a Multiagent Scheduling System (MSS) based on a Resource Schedule and Execution Matrix (RSEM) to tackle the issue of load balancing among photolithography machines in semiconductor Manufacturing. This issue is derived from the dedicated photolithography machine constraint. It is one of the new challenges introduced in photolithography machinery due to natural bias. However, many scheduling policies or modeling methods proposed by previous research for the semiconductor manufacturing production have not addressed the load balancing issue and dedicated machine constraint. In this paper, we describe the design of the proposed MSS approach in detail, including the system architecture, coordination strategy, and its scheduling method on the RSEM. We also present the simulation results that validate the approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.