Abstract

The cost of earthwork involved in road construction can vary widely based on the roadway grades chosen by the designer. There is almost an infinite number of feasible grades available to the designer to choose from, all of which satisfy the geometric specification of the road. For every feasible grade selected, a transportation problem must be solved, which is a very tedious task. The roadway grade selection is usually considered as a stage and the earthwork (transportation) is another stage. These two stages have always been treated separately in the literature. The model presented here combines the roadway grade selection stage and the earthwork transportation stage in a single linear programming problem, thus guaranteeing global optimality.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.