Abstract

The rapid prediction of the full life cycle cost of substation has guiding significance for the construction of substation. In this paper, a substation full life cycle cost prediction model based on advanced particle swarm optimization (advanced PSO, APSO) least squares support vector machine is established. The relevant characteristic index of the substation life cycle is used as the input of the model, and the output is the substation full life cycle cost. The simulation results are compared with the prediction results of APSO optimized LS-SVM, traditional LS-SVM, BP neural network four prediction models and related performance indicators. The simulation results show that the APSO optimized LS-SVM model has better prediction accuracy, and can predict and evaluate the life cycle cost quickly and accurately during substation design and construction, and improve the economics of substation construction.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.