Abstract

A number of photovoltaic pilot projects have been started in Botswana since 1990. The first photovoltaic pro- ject was Manyana PV project which started in 1992. The Japanese International Cooperation Agency (JICA) PV solar pi- lot project is the most recent PV solar project in Botswana, which was launched in 2003 at Kudumatse, Motlhabaneng, and Lorolwana villages. The primary objective of all these projects was to access the viability and sustainability of solar energy technology as an alternative source of energy especially for rural based communities. Depending on the findings, such projects were also intended to be replicated in other parts of the country. Despite all these efforts by the government of Botswana and donor agencies, the level of use of PV solar systems for power generation in Botswana, particularly in isolated communities, is very low. This paper, therefore, discusses the factors that impede the rapid development of photovoltaics power generation systems in the rural environment of Botswana. The study is focused on the photovoltaic power generation project which was car- ried out in three villages in Botswana, namely Kudumatse, Lorolwana and Motlhabaneng. Keyword: Solar energy, barriers in Botswana.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.