Abstract

The leakage current, active power and delay characterizations of the dynamic dual Vt CMOS circuits in the presence of process, voltage, and temperature (P–V–T) fluctuations are analyzed based on multiple-parameter Monte Carlo method. It is demonstrated that failing to account for P–V–T fluctuations can result in significant reliability problems and inaccuracy in transistor-level performance estimation. It also indicates that under significant P–V–T fluctuations, dual Vt technique (DVT) is still highly effective to reduce the leakage current and active power for dynamic CMOS circuits, but it induces speed penalty. At last, the robustness of different dynamic CMOS circuits with DVT against the P–V–T fluctuations is discussed in detail.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.