Abstract

We examine the problem of designing and implementing a continuous-review ( Q , r ) inventory system from an agency perspective, in which the agent's effort influences the item's replenishment leadtime. Our results are as follows: if the agent is risk-neutral, a linear or quadratic contract achieves first-best. For a risk-averse agent with an exponential utility function, assuming a normal leadtime distribution, we determine the optimal linear contract. Extensive numerical experiments suggest that ignoring the possible influence of the agent on the replenishment leadtime can be costly, but that the cost penalty of ignoring agency can be significantly reduced by a simple contract.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.