Abstract

SUMMARYIn Tohoku Region Pacific Coast Earthquake, many of the power equipment (especially center clamping type bushings for power transformers) were damaged due to the seismic motion that exceeds the design criteria. The problem of the conventional seismic analysis became clear as the actual damage was revealed. Since elaboration of seismic analysis and evaluation technology was called for, the elaboration possibility of seismic analysis was verified by carrying out comparison with various test results and the analysis result by the latest technique.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.