Abstract

In order to resolve the supporting problems of the open-off cuts with span of 10m in Tashan coal mine No.3~5 coal seams, this study investigated and analyzed the problems in the current open-off cuts supporting and the supporting parameters, and performed laboratory test and analysis to the coal and rock's mechanical properties. The open-off cut wall rock in Tashan mine has the problem of serious deformation and high possibility of sudden falling. After academic analysis and numerical calculation, a new supporting mode is designed for the supporting of large span open-off cuts: unite high strength anchor bar, combined anchor rope, W steel strip, metal mesh and concrete to form a group anchor seal effect, therefore maintain the tunnel wall rock's stability and safety. Engineering test was conducted at the 8105 working face open-off cuts, the anchor rope's anchorage force changes in the range of 140 ~ 160kN, the maximum delaminating value of the roof in anchorage zone is about 7mm, and the maximum roof-to-floor convergence is 38mm. The result shows that the proposed "anchor bar - combined anchor rope - concrete" supporting model improved the overall bearing capacity of the supporting structure, controlled the tunnel wall rock's deformation effectively, and also achieved the desired effect of the supporting design, ensured the safety of the large section open-off cuts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.