Abstract
Power-to-heat solutions like heat pumps and electric boilers are foreseen to be possible future tools to stabilise international power markets with high proportions of variable power supply. Temporary low cost electricity can be used for heat generation at times with high availability of wind and solar power through substitution of ordinary heat supply, hence contributing to increased energy system sustainability. Power-to-heat installations in district heating systems are competitive due to low specific investment and installation costs for large electric boilers, heat pumps, and heat storages. Several large-scale heat pumps were installed in Swedish district heating systems during the 1980s, since a national electricity surplus from new nuclear power existed for some years. The aim of this paper is to summarise the accumulated operation experiences from these large Swedish heat pumps to support and facilitate planning of future power-to-heat solutions with heat pumps in district heating systems. Gained experiences consider; installed capacities, capacity utilisation, heat sources used, refrigerant replacements, refrigerant leakages, and wear of mechanical components. The major conclusion is that many of the large thirty-year-old heat pumps are still in operation, but with reduced capacity utilisation due to internal competition from waste and biomass cogeneration plants in the district heating systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.