Abstract

This paper focuses on simultaneous optimisation of production planning and scheduling problem over a time period for synchronous assembly lines. Differing from traditional top-down approaches, a mixed integer programming model which jointly considers production planning and detailed scheduling constraints is formulated, and a Lagrangian relaxation method is developed for the proposed model, whereby the integrated problem is decomposed into planning, batch sequencing, tardiness and earliness sub-problems. The scheduling sub-problem is modelled as a time-dependent travelling salesman problem, which is solved using a dynasearch algorithm. A proposition of Lagrangian multipliers is established to accelerate the convergence speed of the proposed algorithm. The average direction strategy is employed to solve the Lagrangian dual problem. Test results demonstrate that the proposed model and algorithm are effective and efficient.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.